Do I need GPR before drilling?
For any drilling into structural concrete without complete as-built records, you need GPR before drilling. It is the standard mitigation, and on post-tension floors it is non-negotiable.
The short answer: you need GPR before drilling on almost any structural concrete element where you do not have complete and reliable as-built records.
Why pre-drill scanning matters
Drilling into reinforced concrete without scanning carries real risks:
- Severed electrical cables: safety incident, outage, expensive remedial work.
- Severed water and gas services: flood, gas escape, statutory consequences.
- Damaged conduit and comms: chasing-out and re-pouring slab segments.
- Damaged post-tension tendons: one of the most serious avoidable mistakes on a slab.
- Damaged sprinkler pipework: flood damage to occupied space below.
- Project delays: even minor strikes can cost more in programme than the survey would have taken.
The cost of a pre-drill scan is usually much smaller than the cost of any of these.
When it is non-negotiable
- Post-tension floors. A struck PT cable can cause structural redistribution, costly repair, or worse.
- Live electrical environments (data centres, healthcare, manufacturing).
- Heritage and listed buildings where invasive damage would be irreversible.
- Engineered slabs (transfer slabs, post-tension floors, beam-and-block) with specific reinforcement layouts.
- Drilling close to slab edges or known services where geometry is uncertain.
If the slab might be post-tension and you do not know for sure, treat it as PT and scan. The downside of caution is a short delay; the downside of a strike is enormous.
When it might not be needed
For small fixings on lightly reinforced ground-bearing slabs in non-critical environments, pre-drill scanning is sometimes skipped, but the cost-benefit tilts against this for almost any structural element. The honest position: when in doubt, scan.
What good practice looks like
Pre-drill GPR should be part of the contractor’s RAMS for drilling into structural concrete. A typical pattern:
- Mark the proposed drilling positions on the slab.
- Brief the surveyor on the structure type, history, and known plant.
- Survey the marked positions and a reasonable buffer.
- Mark detectable reflectors found.
- Reposition any drilling target that conflicts.
- Have the engineer or contractor approve the final drilling positions.
Cost vs benefit
A pre-drill scan usually costs far less than repairing a struck cable, and a struck PT tendon can cost far more again. The cost case favours scanning on virtually any non-trivial drilling operation.
When it is skipped
The temptation to skip the scan usually comes from one of three places: tight programme, tight budget, or “it’s just a few small holes”. The first two are addressable in planning. The third is a category error: a small hole through a PT tendon causes the same damage as a large one.
If your project has reinforced concrete and you have any doubt at all about what is inside it, the right answer is almost always to scan first. For a fuller treatment, see our article GPR scanning before drilling, why it matters.
Need rebar detection or a pre-drill scan on a live site? Our concrete scanning services cover London and the UK. Get a quote.
Ready to see what's beneath the surface?
Tell us what you're working on. We call back the same working day with a method and a date in the diary.