How long does a concrete scan take?

How long a concrete scan takes depends on scope. A typical pre-drill scan on a small area is 1 to 2 hours on site, with marks on the slab before we leave and the report within 5 working days. Reinforcement mapping or PT scans usually take a full day.

A typical pre-drill scan on a small area takes 1–2 hours on site, with marks on the slab before we leave and the written report within 5 working days. Larger reinforcement-mapping or PT scans usually take a full day on site.

The full answer is in our article How long does a GPR survey take.

For the survey itself, see ground penetrating radar scanning from Corvus: marks on the slab before we leave, report and CAD plan within 5 working days.