What is safe digging practice?

Safe digging practice is the HSG47 approach to breaking ground near buried services: plan from the records, locate with a survey, mark the ground, hand dig trial holes to confirm, keep mechanical plant clear of indicated services and treat every cable as live.

Safe digging practice is the set of controls in the HSE’s guidance HSG47, Avoiding danger from underground services, for excavating where cables and pipes may be present. It runs in three stages.

Plan. Get the utility owners’ records before the work is programmed. Decide how the excavation will be done given what the records show, and tell the people doing the work what has been found.

Locate. Survey the area on site before digging. A cable avoidance sweep with a CAT and Genny finds energised cables and metal pipes that can be given a signal. A PAS 128 utility survey adds a records search and a GPR pass, which is how plastic pipes, dead cables and drains get picked up, and gives every service on the drawing a quality level. Mark the positions on the ground and keep the drawing with the gang.

Dig. Hand dig trial holes to expose and confirm each service before mechanical excavation. Keep excavator buckets clear of the indicated line of a service, with hand digging inside a clearance of around 500 mm. Use spades and shovels rather than picks, forks or pins near cables. Assume every cable is live until the owner confirms it is dead. Support any exposed service, and stop if anything unexpected turns up.

The survey does not replace the trial holes. It tells you where to put them and how wide the hand-dig zone needs to be. A line marked QL-B1 was found by two methods that agree; a line marked QL-B4 is an assumption from the records. See HSG47 explained for the full picture.