UTILITY SURVEY

CAT and Genny Survey

A quick electromagnetic sweep for energised cables and metallic pipes, honestly described.

CSCS Registered Same-day call-back Marks before we leave Canary Wharf, UK-wide

A service-avoidance scan, honestly described.

What it is

A CAT and Genny scan is a quick electromagnetic sweep to find energised cables and metallic pipes before a small excavation. It is fast, it is cheap, and it is not a PAS 128 survey. We will do one when it is the right tool and tell you when it is not.

What it finds, and what it does not

It finds live power, signal-carrying telecoms, and metallic pipes we can clip a signal onto. It does not find plastic water or gas, clay drainage, dead cables, or anything the locator cannot energise, and it gives no reliable depth without a GPR pass.

When it is enough

Small hand-dug excavations, post holes, and trial pits where the records are good and the ground is open.

When it is not

Machine excavation, piling, anything with plastic gas or water nearby, and anything a client has asked to be PAS 128.

Upgrade path

The same visit becomes a Type B with a GPR pass and a records search. That adds a records pack, a second method, positioning and a drawing with a quality level on every line, so it adds time and cost. A CAT and Genny sweep is a few hours; a Type B is one to three days on site plus office processing.

Is a CAT scan enough for the HSE?

Not by default. HSG47 expects a safe system of work for the excavation, based on the risk assessment, the available records and a suitably competent scan. Whether a CAT and Genny scan is enough is a judgement on your risk assessment, not a yes. If the risk is anything above a small hand dig in open ground, specify a Type B.

Where it helps

  • For a scoped electromagnetic service-detection visit
  • Where the project team needs detection findings marked and recorded on the day

What you receive

  • Detected routes marked on the ground
  • Short photo record supplied on the day
  • Depth estimates where the method and signal conditions support them
  • Record of relevant detection limitations

A note on interpretation. The sweep does not find every service and is not a full PAS 128 Type B survey. Dead or unloaded cables may still be traceable where a signal can be applied. Safe excavation arrangements remain necessary.

Got a dig coming up?

Send the work area, planned excavation and available records. We call back the same working day.